EESC

EGYPTIAN ENGINEERING SERVICES COMPANY Ltd

Power Station Projects



 

            Damanhour Power Station.

Cairo North Power Station II

Nubaria Power Station. I ,II &III

Sidi Krir Power Station 3&4

Kurimatt Solar Power Station

Kurimatt Power Station

Talkha Power Station

Misratah Power Station LIBYA

Fertilizers Projects

Egyptian Basic Industries company Factory

Egyptian Fertilizers company I & II

Egyptian Fertilizer Company Revamp Project

Helwan Fertilizer Company

Inside Factories Projects

Cement Factories

New Aqua ASME Qualification & Renew

Suez Steel Factory

Petrol & Petrochemicals Projects

Bagram Fuel Farm US Military Base Afghanistan

El-Salam Gas Train 3&4 Project

El-Gobel Project KSA

MOPCO 2 Project

We still under negotiations with several companies for many projects like and not limited to (new power stations & shutdowns in old one's ),(new fertilizers& shutdowns in old one's ) inside and outside Egypt during 2015-2016


CLIENT

PROJECT DESCRIPTION

PROJECT TYPE

PLACE

YEAR


Ayoun Mousa Power Plant & Siemens

RT Inspection for critical shut down

Ayoun Moua Pant

Ayoun Moua

2015


Dngo Contraction Saudi

Welder Qualification Tests

WQT

Cairo

2015


Orascom Industrial Construction

RT Inspection for tanks

Assuit Power Plant

Assuit

2015


GEA-MARS

RT Inspection for piping

6th of October city

Cairo

2015 

Salcef S.P.A

UT,MT,VT& Micro ,Macro Exam For Railways Flash Butt PQR

Bashteel welding Site , Giza

Giza

2014


Sidi Krir Power Plant & Siemens

RT Inspection for critical shut down

Sidi Kirir Power Plant

Alex

2014


El-Kroum Middle East / Ansaldo

Hardness & PMI test

North Giza Combined Cycle

North Giza

2014 

Italcementi Group

UT,MT,PT,VT Inspection for Kilns , Tries, Gears

Factories

All Plants

Register with long term Contract


GAMESA-DSD

UT Inspection for El-Zafarana Wind Power Plant (Wind Farm)

Factory

Bilebes

10th Of Ramadan City

2013 -2014


TITAN Cement Egypt

UT,MT,PT,VT Inspection for Kilns , Tries, Gears

Factories

All Plants

Register with long term Contract


Daewoo E&C

UT,MT,VT

Misrata Power Plant

Misrata, Libya

2013


Danieli SPA-Suez Steel Company

UT,MT,PT For Reactor weld

Factory

Suez

2013


Future Advanced Company for Technology - FACT

Heat Treatment Furnace Fabrication , Installation & Training

Workshop

Factory

El-Tebeen

Talkha Fertilizer company

2013


National Company For Steel Structure

Dimension , Holiday test , Pneumatic test ,Visual Test & welder qualification for underground storage tanks for Libyan client

Workshop

Abu-Rawash

2013 

New Aqua

ASME(U),(S),(R)Stamps

& National Board Renew

Workshop

El-Tebeen

2013


Egyptian Basic Industrial Company EBIC

Heat Treatment work For Piping during shut down

Factory Work

Suez Gulf Industrial zone

2012


Suez Steel Company

N.D.T (UT flow detection & thickness)(MT)(Visual Inspection )For 2 Cranes GOTTWALD

Ports Work

Al-Adabiya Port

Suez

2012


El-Nasr For Fertilizers Company

Heat Treatment work For Piping during shut down

Factory Work

Attaka - Suez

2012


Petroment

RT Activity

Factory work

El-Ain El-Soukhna

2012


Egyptian fertilizer Company

RT , UT, HT work activity during the shut down

Factory work

El-Ain El-Soukhna Plant- Suez

2012


Italcementi Group

UT, MT, PT & visual Inspection for Kilns , Tries, Gears

Factories Works

Helwan &Tourah & Suez Plants

2012-Still running


Suez Steel Company

RT( X-ray & Gama-ray) & PT & UT

Site Work

Suez

2011-2012


Orascom Industrial Construction

Electrical Pre-Heating and PWHT for piping Egyptian fertilizer

Site Work

El-Ain El-Soukhna

Suez

2011-2012


IEMSA

Electrical PWHT for piping MOPCO

Site Work

Damietta Free Zone

2011


NEW Aqua

QC Activity and welding process

Work Shop

Damietta Free Zone

2011


ALSTOM Thermal Services

UT & PT & MT

Site work

Damanhur Power Plant

2011


Italcementi group

UT & PT &MT

Factory Works

Suez Plant

2011


New Aqua

ASME(U),(S),(R)Stamps

& National Board

Workshop

El-Tebeen

2010


NEM & PSC

QA/QC Activity for

the boiler and piping

SidiKrir POWER STATIONS

Site Work

SidiKrir

2009-2010


STF & PSP

QA/QC Activity for

the boiler and piping

Nubaria POWER STATIONS

Site Work

Work Shop

Nubaria

2008-2009 


IBRADROLA & H.A.S

QA/QC Activity for

the boiler and piping

Site Work

Work Shop

ELKUREIMAT solar POWER STATIONS

2009-2010


CMI & ARESCO & El-Hashimya

QA/QC &(RT, UT, PT, MT) & (PWHT) ON GAS TURBIN, BOILER PIPES AND DRUMS.

Site Work

Work Shop

TALKHA & ELKUREIMAT

2007-2009


Lafarge Cement Company

Ultrasonic test on Kiln Line No. 1

Factory works

Beni-suife Cement Company

2007


Egyptian Cement Company

Ultrasonic test on all welds of Kiln Line No. 5

Factory Works

Egyptian Cement Company

2008


Some examples of the project supervised by the top management :- 

CLIENT

PROJECT DESCRIPTION

PROJECT TYPE

PLACE

YEAR 

NEM&DSD FEROMETALCO

(RT, UT, PT, MT) & (PWHT) ON GAS TURBIN, BOILER PIPES AND DRUMS.
Site Work
Work Shop
CAIRO NORTH
2004- 2005

NEM & IBSF

(RT, UT, PT, MT) & (PWHT) ON GAS TURBIN, BOILER PIPES AND DRUMS

Site Work

Work Shop

CAIRO NORTH II

2005-2006


SIEMENS & DSD FEROMETALCO

(RT, UT, PT, MT) & (PWHT) ON GAS TURBIN, BOILER PIPES AND DRUMS

Site Work

ELKUREIMAT II

2004


UHDE & ORASCOM

(RT, UT, PT, HT, MT) & (PWHT) ON GAS & CHEMICAL PIPE LINES.EFC Plant II

Site Work

Suez Gulf

2005-2006


UHDE & ORASCOM EMSSA

(RT, UT, PT, HT, MT) & (PWHT) ON GAS & CHEMICAL PIPE LINES.

Egyptian Fertilizer

Site Work

Suez Gulf

2003-2004


EDF & 3EC

(RT, UT, PT, MT) & (PWHT) ON GAS TURBIN, BOILER PIPES AND DRUMS

Site Work

Suez Gulf

2000-2001


DSD FEROMETALCO & DELT5 ,SEGAS

QA/QC Activity for Damietta LNG Tanks

Site Work

Damietta

2003


Italcementi Group

Ultrasonic test on Kiln Line No. 3

Magnetic test on tiers of Kiln No.3

Factory works

Helwan cement Company

2006 

EESC top manager had worked outside Egypt in several Jobs like-

  1. Afghanistan US military base at Bigram
  2. Saudi Arabia Goubel I Project
  3. Qatar LNG
  4. Sudan El-Takamol Project